
Yasemin Limon
Yasemin Limon has received her Ph.D. in Industrial Engineering from the University of Wisconsin-Madison in 2019. She also holds an M.S. degree in Manufacturing and Production Systems from the University of Wisconsin-Madison, B.S. and M.S degrees in Industrial Engineering from the Middle East Technical University. Her research interests include supply chain management, contract design, and resource allocation in the context of biopharmaceutical operations.
>> SELECTED PUBLICATIONS
Limon, Y., Martagan, T., Krishnamurthy, A. (2024). Contracts for biopharmaceutical manufacturing based on production cost and capabilities. International Journal of Production Research, 62 (7), 2640 – 2662.
Limon, Y., Tang, C. S., Tanrısever, F. (2023). Sequential versus concurrent final phase product development: Approval uncertainty, time-sensitive consumers, asymmetric competition, and government subsidy. Production and Operations Management, 32 (11), 3521 – 3540.
Limon, Y., Krishnamurthy, A. (2020). Dynamic Resource Scheduling of Biomanufacturing Projects. Computers and Industrial Engineering, 147, 1-11.
Limon, Y., Krishnamurthy, A. (2020) Resource Allocation Strategies for Protein Purification Operations. IISE Transactions, 52 (9), 945-960.
Martagan, T., Limon, Y., Krishnamurthy, A., Leland, P., Foti, T. (2019). Aldevron Accelerates Growth Using Operations Research in Biomanufacturing. INFORMS Journal on Applied Analytics, 49(2), 137-153.
Limon, Y., Azizoglu, M. (2018). New Heuristics for the Balanced k-Chinese Postmen Problem. International Journal of Planning and Scheduling, 2(4), 331-349.ğlu-Aygün, Z., Erdogan, B., Caughlin, D. & Bauer, T. (in press). Transformational leadership, idiosyncratic deals and employee outcomes. Personnel Review.
- yasemin.limon@bilkent.edu.tr
- MA 110
